Header image

 Mascol Engineering Co.,LTD

 Leading Technology in Integration Engineering

line decor   HOME     BACK  


     ENGLISH     中文


 
 

 


 

 

   

1. Proj. Name:Dawuding water gate and water pump project

2. Client:Water Resource Agency, Ministry of economic affairs

3. Proj. Period:Dec. 2010∼Dec. 2011

4. Proj. Description:

The project is to build on top of the original Dawuding flood gate; adding 4 pressure release gate, 4 flood gates, 2 automatic gate and increase channel to 223 meters. Also increase a water pump station, 3 diversion culverts, and detention pond, regulation wells pumping into the flood pool, then pumping water into Linbian river with diesel engine powered pumps. Related construction include discharge protection work, dike RC, 5T cement blocks, embankment slop work, road upgrade and flood control and temporary water pumping system.

5. Major construction item:

◆   Piles  x46,pre-forced pile x40, embankment concrete blocks  x 88

◆   Purchase and install 2 sets of 3CMS water pump with angle gear reducer, clutch and 2

sets of 300HP diesel powered engines

◆   Outdoor oil tank x 1 and 2 oil pumps and indoor oil tank x2

◆   4 floodgates, 2 intake doors, 3 automatic gates, detention pond

◆   New electric and instrument control system (PLC) and 1 set of electric generator.