1. Proj. NameDawuding water gate and water pump project

2. ClientWater Resource Agency, Ministry of economic affairs

3. Proj. PeriodDec. 2010∼Dec. 2011

4. Proj. Description

The project is to build on top of the original Dawuding flood gate; adding 4 pressure release gate, 4 flood gates, 2 automatic gate and increase channel to 223 meters. Also increase a water pump station, 3 diversion culverts, and detention pond, regulation wells pumping into the flood pool, then pumping water into Linbian river with diesel engine powered pumps. Related construction include discharge protection work, dike RC, 5T cement blocks, embankment slop work, road upgrade and flood control and temporary water pumping system.

5. Major construction item:

   Piles  x46,pre-forced pile x40, embankment concrete blocks  x 88

   Purchase and install 2 sets of 3CMS water pump with angle gear reducer, clutch and 2

sets of 300HP diesel powered engines

   Outdoor oil tank x 1 and 2 oil pumps and indoor oil tank x2

   4 floodgates, 2 intake doors, 3 automatic gates, detention pond

   New electric and instrument control system (PLC) and 1 set of electric generator.