1.
Proj. Name:Dawuding
water gate and water pump project
2.
Client:Water
Resource Agency, Ministry of economic affairs
3.
Proj. Period:Dec.
2010∼Dec. 2011
4. Proj. Description:
The project is to build on top of the original
Dawuding flood gate; adding 4 pressure release gate, 4 flood gates, 2
automatic gate and increase channel to 223 meters. Also increase a water
pump station, 3 diversion culverts, and detention pond, regulation wells
pumping into the flood pool, then pumping water into Linbian river with
diesel engine powered pumps. Related construction include discharge
protection work, dike RC, 5T cement blocks, embankment slop work, road
upgrade and flood control and temporary water pumping system.
5. Major construction item:
◆
Piles
x46,pre-forced pile x40, embankment concrete blocks x 88
◆
Purchase
and install 2 sets of 3CMS water pump with angle gear reducer, clutch and 2
sets of 300HP diesel powered engines
◆
Outdoor
oil tank x 1 and 2 oil pumps and indoor oil tank x2
◆
4
floodgates, 2 intake doors, 3 automatic gates, detention pond
◆
New electric and instrument control system
(PLC) and 1 set of electric generator.
|