Header image

 Mascol Engineering Co.,LTD

 Leading Technology in Integration Engineering

line decor   HOME     BACK  


     ENGLISH     中文


 
 

 


 

   

1. Proj. Name:Repairs & Maintenance for No.1 Test Run Platform

2. Client:Civil Aeronautics Administration / CKS Air Port Station

3. Proj. Period:Oct. 2005 ∼ Jan. 2006

4. Proj. Description:

To replace all existing rusted or damaged anti-noise expanded metal panels and fixtures of airflow reflection and noise reduction for the exiting No.1 test run platform, this project has 35 pieces of galvanized expanded metal panels with an extra addition of 17 pieces. Totally, 52 pieces of expanded metal panel were replaced.

5. Major construction item:

◆  Mobile up & down working deck

◆  Hydraulic type mobile crane and facilities

◆  Engine type compressor