Header image

 Mascol Engineering Co.,LTD

 Leading Technology in Integration Engineering

line decor   HOME     BACK  


     ENGLISH     中文


 
 

 


 

   

1. Proj. NameEstablishment of No.2 Test Run Platform

2. ClientCivil Aeronautics Administration / CKS Air Port Station

3. Proj. PeriodJuly. 2006∼Nov. 2007

4. Proj. Description

The established purpose of test-run platform is aiming to level down turbulence flow while airplane engine is at early starting. A noise dissipating wall consisting of sound absorption panel and steel structure is erected right behind the test run platform for noise reduction.

5. Major construction item:

  Civil work for test-run platform

  Steel structure with expanded metal for noise reduction and airflow refraction

  Civil work for noise dissipating wall

  Steel structure for noise dissipating wall

  Sound absorption panel 

  Vehicle control gate