1.
Proj. Name:CPCT
SRU #5 Tail Gas Emission Improvement EPC Turn-Key Project
2.
Client:Tao-yuan
Refinery of CPC Corp., Taiwan
3.
Proj. Period:Apr.
2022∼July
2023
4. Proj. Description:
This project is for CPCT to reduce SRU #5 Tail Gas SO2
emission by adding a SO2/H2S
absorption Unit of caustic Scrubbing Facilities before the existing Thermal
Oxidizer (F-4562) within the limited area of 7M x 7M (not incl. caustic
storage tank). Based on SRU #5 Tail Gas Inlet/Outlet Design Baselines, it is
expected that:for
Case (1) De-Sulfur oper. cond. @14,000 Nm3/h Max. w/ 1.0 Vol% SO2
concent. Inlet, the outlet SO2
concent. can be
≦50
vppm, and the effluent of COD
≦1,000
mg/l, PH:6~9
after scrubbing;for
Case (2) Nor. oper. and Case (3) Up-Set oper. conditions @12,000 Nm3/h
Max. w/ 0.01 & 2.0 Vol% H2S
concent. Inlet respectively, the outlet H2S
concent. can be effectively reduced
≧90%
after scrubbing. In addition to the above design requirements, it shall also
be met that the total system pressure drop
≦1,000
mmH2O
and Dust removal eff.
≧50%.
5. Major construction item:
◆
SO2/H2S
tail gas Scrubbing Facilities x 1 Unit (Incl. AL-6XN/316L Inlet Barrels,
316L
Disengagement Vertical
Vessel, Teflon Reverse jet Nozzles (x2),
316L Froth Columns,
316L Chevron Demisters……, etc.).
◆
316L Scrubbing Circulation Pump x 2 sets, 316L Liquid Caustic Pump x 2 sets.
◆
Oxidation Air Blower x 2 sets(Inc.
Noise Hood).
◆
FRP
Liquid NaOH Tank x 1 set.
◆
20”/6”∮
SO2/H2S
tail gas
Inlet/Outlet Pipelines retrofitted
(Inc. Hot Insulation)
and/or new added with Shutoff
Valves (x3).
◆
Process & Utility Piping System w/different kinds of Material, Effluent
Wastewater Piping
(incl. 304 SS Effluent Filter x 1 set).
◆
Civil Foundation, Steel Structures, Operation Platforms, Dikes and related
Acquisition
of Government Permits and Construction License Application.
◆
Instruments Incl. Control Valves, Radar/Ultrasonic Liquid L/T, Magnetic or
D/P Flow meters,
Density Transmitters, PH Analyzers, Thermometer/ Pressure Gauges, etc.
◆
Power Equipment Incl. MCC Panel, Site Explosion-proof Lighting Fixture,
Grounding,
Communication, Power Cable and Conduit, Site Switching Station.
|