1.
Proj. Name:CPCT
Alkylation plant Tail Gas Emission Improvement EPC Turn-Key Project
2.
Client:Tao-yuan
Refinery of CPC Corp., Taiwan
3.
Proj. Period:June
2023∼Oct.
2024
4. Proj. Description:
This project is for CPCT to reduce Alkylation plant Tail Gas SO2
emission exhausted from the outlet of final absorbing tower(V-360) by adding
a SO2 absorption Unit of caustic Scrubbing Facilities before the
existing chimney (M-327).The available space to be used for construction is
limited within an area of
6M x 6M.Based on Alkylation plant Tail Gas Inlet/Outlet Design Baselines, it
is expected that:in
case of the Max.7736Nm3/h waste sour gas flow rate with
0.11 Vol% SO2 concent Inlet, the outlet SO2 concent
can be
≦30
vppm(@6%
O2 , dry base).In addition to
the above design requirements, it shall also be met that the total system
pressure drop
≦600
mmH2O and Dust removal eff.
≧50%.
5. Major construction item:
◆
SO2
waste sour tail gas Scrubbing Facilities x 1 Unit (Incl. 316L Inlet Barrel,
316L
Disengagement Vertical
Vessel, Teflon Reverse jet Nozzle (x1),
316L
Chevron
Demisters
,Derakane 411 cage with special fibers and alley 20 fasteners Mist
Eliminators
(x10)… etc.).
◆
316L Scrubbing Circulation Pump x 2 sets
◆
24”∮
SO2
tail gas
Inlet/Outlet Pipelines retrofitted and/or new added with Shutoff
Valves (x2).
◆
Process & Utility Piping System w/different kinds of Material, Effluent
Wastewater Piping.
◆
Civil Foundation, Steel Structures, Operation Platforms, Dikes and related
Acquisition
of Government Permits and Construction License Application.
◆
Instruments Incl. Control Valves, Radar/Ultrasonic Liquid L/T,
Magnetic or D/P Flow
meters, Density Transmitters, PH Analyzers, Thermometer/ Pressure Gauges,
etc.
◆
Power Equipment Incl. MCC Panel, Site Explosion-proof Lighting
Fixture, Grounding,
Communication, Power Cable and Conduit, Site Switching Station.
|