1. Proj. NameNo.3 Waste Gas Ground Flare Package (45 T/H)

2. ClientChinese Petroleum Corp. / Taoyuan Refinery

3. Proj. PeriodMar. 1996Feb. 1997

4. Proj. Description

This project is a newly constructed No.3 Waste Gas Ground Flare Package with capacity of 45 Tons/Hr in turnkey basis, which included water seal drum modification of existing No.2 Elevated Flare and supply of accessory equipments & bulk materials.  In addition to the above mentioned, it also required basic design with modificationdetailed designmaterial supplytransportationfabrication & field erectioninstallationconstructionassemblytest run and start up, totally based on the requirements in turnkey basis.

5. Major construction item:

  Engineering plan & design

  Civil works

  Assembly & adjustment of I&E monitoring equipment

  Electric lighting

  Fabrication & Installation of piping & machinery equipment

  Fabrication & start up of accessory equipment