1.
Proj. Name:New
construction project (mechanical, electrical & air conditioning)
of Kinmen winery fermentation building
2.
Client:Kinmen
Kaoliang Liquor Inc.(KKL)
3.
Proj. Period:Aug.
2017∼Apr.
2022
4. Proj. Description:
The project is set up due to KKL intends to further improve and optimize
liquor quality. It’s divided into two parts namely civil / architectural,
and mechanical / electrical & air conditioning. The project is in
association with civil / architectural schedule to complete the electrical
work, fire protection, plumbing, fermentation pond conveyor system, liquor
soup collecting system, air compression system and HVAC system, etc.
5. Major construction item:
◆
Grounding and lightning system.
◆
HV switchgear, DP switchboxes, lighting and busway system.
◆
Telecommunication/information/television, CCTV and emergency rescue
equipment.
◆
Plumbing system including tap water, drainage system and raining water
recovery
equipment.
◆
Fire protection system including firefighting equipment, fire alarm, PA,
smoke evacuation
system, fire barrier system.
◆
Conveyor system into fermentation pond including six (6) tipping machines,
ninety (90) belt
conveyors with its electrical
equipment, PLC control equipment and system start up, etc.
◆
Liquor soup collecting system including liquor soup collecting tank, piping
and its electrical
equipment, system start
up, etc.
◆
Air compression system.
◆
HVAC system including four (4) chillers, ten (10) water pumps, four (4) heat
pumps, eight
(8)
cooling towers, two (2)
expansion tanks, twelve (12) heat exchangers, eighteen (18) air
handling
units (AHU), twenty two (22) separate type air conditioners, fifty three (53)
ventilators, twenty
four (24) air curtains with its control equipment and
installation works,
etc.
◆
Ventilation ductworks including integrate type duct, flexible duct, return
air box, ABS made
air grill, air outlet fire
damper, check damper, inspection access door, etc.
|