1.
Proj. Name:CPC
Lin Yuan No.2 Condensate water purification plant EPC Turnkey
Project
2.
Client:CPC
Lin Yuan Petrochemical Plant
3.
Proj. Period:Nov.
2011∼Feb. 2013
4. Proj. Description:
This turn-key project is to design and remove
original old facility and re-build a new condensate purification facility
which can continuously operate 168 hours with production capacity of 350 ton
of pure water per hour.
5. Major construction item:
◆
Remove No.4 existing water purification units。
◆
Pre-filtration processing unit includes 110M3 stainless steel tank, SS304
vessel contains high
efficiency PP fiber
filter x 3 sets,
Carbon steel
vessel lined with rubber contains active carbon filtration
material x 3
sets.
◆
Ionic exchanger resin vessel x 2 sets and acid-base regenerating equipments.
◆
Equipment civil foundations and steel structure with operating platform.
◆
Explosive-proof motor with stainless steel pump x 10 sets.
◆
Electric power equipments: MCC panels, Lighting fixtures and grounding
system.
◆
Instrument renewal including detection instruments, silica analyzer,
pressure and
temperature transmitters
◆
PLC
and intergraph control system, underground pipe replacements.
|