1. Proj. NameCPC Lin Yuan No.2 Condensate water purification plant EPC Turnkey

Project

2. ClientCPC Lin Yuan Petrochemical Plant

3. Proj. PeriodNov. 2011∼Feb. 2013

4. Proj. Description

This turn-key project is to design and remove original old facility and re-build a new condensate purification facility which can continuously operate 168 hours with production capacity of 350 ton of pure water per hour.

5. Major construction item:

   Remove No.4 existing water purification units。

   Pre-filtration processing unit includes 110M3 stainless steel tank, SS304 vessel  contains high

efficiency PP fiber filter x 3 sets,  Carbon steel vessel lined with rubber contains active carbon filtration

material x 3 sets.

   Ionic exchanger resin vessel x 2 sets and acid-base regenerating equipments.

   Equipment civil foundations and steel structure with operating platform.

   Explosive-proof motor with stainless steel pump x 10 sets.

   Electric power equipments: MCC panels, Lighting fixtures and grounding system.

   Instrument renewal including detection instruments, silica analyzer, pressure and

temperature transmitters

   PLC and intergraph control system, underground pipe replacements.