1.
Proj. Name:EOD
Plant Instrumenation Installation Project
2.
Client:Oriental
Union Chemical Corporation (OUCC)
3.
Proj. Period:Sep.
2011∼Mar. 2012
4. Proj. Description:
This project is to install control instruments
for OUCC EOD plant which includes electrical piping, wring, instrument
installation for process area, tank area, filling station area and control
room marshaling panel wire connection.
5. Major construction item:
◆
Instrument wiring:42,500M
◆
Instrument conduits:14,560M
◆
TUBE SMLS 316SS,1/2"OD:2,400M
◆
CONTROL VALVE:231sets
◆
Junction Box:35 sets
◆
PRESSURE TRANSMITTERS:68 units
◆
D/P TRANSMITTERS:40 units
◆
TEMPERATURE TRANSMITTERS:10 units
◆
RTD(Pt100) SENSOR:57 units
◆
PRESSURE GAUGE:82 pcs
◆
TEMPERATURE GAUGE:37 pcs
|