Instrument installation Control-valve installation

1. Proj. NameEOD Plant Instrumenation Installation Project

2. ClientOriental Union Chemical Corporation (OUCC)

3. Proj. PeriodSep. 2011∼Mar. 2012

4. Proj. Description

This project is to install control instruments for OUCC EOD plant which includes electrical piping, wring, instrument installation for process area, tank area, filling station area and control room marshaling panel wire connection.

5. Major construction item:

   Instrument wiring:42,500M

  Instrument conduits:14,560M

  TUBE SMLS 316SS,1/2"OD:2,400M

  CONTROL VALVE:231sets

  Junction Box:35 sets

  PRESSURE TRANSMITTERS:68 units

  D/P TRANSMITTERS:40 units

  TEMPERATURE TRANSMITTERS:10 units

  RTD(Pt100) SENSOR:57 units

  PRESSURE GAUGE:82 pcs

  TEMPERATURE GAUGE:37 pcs

  MASS FLOWMETER:21 sets

  VIBRATION TYPE LEVEL SWITCH:37 units

  PRESSURE SWITCH:9 sets

  PITOT TUBE:5 sets

  GAS DETECTOR:12sets

  GAS BLANKETING REGULATOR:15 sets