1. Proj. NameSMA Pilot Plant Retrofit Turnkey Project

2. ClientTaiwan Prosperity Chemical Corp. (TPCC)

3. Proj. Period2019.062019.12

4. Proj. Description

This Project is located in TPCC Lin-Yuan plant, to retrofit existing Pilot Plant to meet the new process and standard requirements. The Pilot Plant is retrofitted according to the Clients process requirements and the scopes include: control system, equipments, piping, steel structure, foundations, instruments, electric, painting, thermo insulation and detail designs. Pre-commissioning, testing, and operation training shall also be provided.

5. Major construction item:

  Existing tanks and vessels, condensers, pumps, blowers, & cooling conveyor to be

relocated.

  Existing tanks x 5, circulation pump x 1, packaged equipments x 6, and related piping

& wiring removed.

  Client's new provided rotary machines x 3 and vacuum system x 1, transported to site

and installed.

  Modification of existing stainless steel tanks x 2

  New purchase: stainless steel tanks x 4, pneumatic pumps x 5, centrifugal pump x 1, tank

mixers x 2, blower x 1, electric powered explosion proof hoist and hand-hoist x 1,

packaging machine x 1

  Original platform removed, reconstruction of new platform including foundation and steel

structure works.

  Piping, accessories, support, valves purchase and installation

  Instruments and control system including PLC, HMI, indicators, safety valves, control

valves, wiring, electric conduitinstallation, testing and calibrating.

  Electric power supply and equipments, grounding system, cable box extension installation

and testing.

  Other related equipments and piping thermal insulation works.