1.
Proj. Name:SMA
Pilot Plant Retrofit
Turnkey Project
2.
Client:Taiwan
Prosperity Chemical Corp. (TPCC)
3.
Proj. Period:2019.06∼2019.12
4. Proj. Description:
This Project is
located in TPCC Lin-Yuan plant, to
retrofit existing Pilot Plant
to meet the new process and standard
requirements.
The
Pilot Plant is retrofitted
according to
the Client’s
process
requirements and
the scopes
include: control system, equipments, piping, steel structure, foundations,
instruments, electric, painting, thermo insulation and detail designs.
Pre-commissioning, testing, and operation training
shall
also
be
provided.
5. Major construction item:
◆
Existing
tanks and vessels, condensers,
pumps,
blowers,
&
cooling
conveyor
to be
relocated.
◆
Existing
tanks x 5, circulation pump x 1, packaged equipments x 6, and related piping
&
wiring removed.
◆
Client's
new
provided rotary machines
x 3 and vacuum system x 1, transported to site
and installed.
◆
Modification
of
existing
stainless steel tanks
x
2
◆
New purchase: stainless steel tanks
x
4,
pneumatic
pumps
x
5, centrifugal pump x 1, tank
mixers
x 2, blower x 1,
electric powered explosion proof
hoist
and hand-hoist
x 1,
packaging machine x
1
◆
Original platform removed, reconstruction of new platform including
foundation
and steel
structure works.
◆
Piping, accessories, support, valves purchase and installation
◆
Instruments
and control system including
(PLC,
HMI, indicators, safety valves, control
valves, wiring, electric
conduit)installation, testing and calibrating.
◆
Electric
power supply and equipments, grounding
system, cable box extension installation
and testing.
◆
Other related equipments and piping thermal insulation works.
|