Proj. Name:Waste
water system and oil tank VOC recovery
EPC project
2.
Client:Taiwan
SM
Corporation
(TSMC)
3.
Proj. Period:2019.08∼2020.04
4. Proj. Description:
This Project
is
to
revamp
TSMC Kaohsiung
existing
plant waste water and oil tank VOC recovery
system,
which scope
includes design, procurement and construction
(EPC).
According to
Client’s
requirements
and data
given,
Mascol
shall assess
and design the new
recovery
system
and then the recovered VOC to be burned out in the boiler
to meet new environmental VOC emission standards.
This
project will need to understand the characteristic of
various
tanks’
products and related basic designed data;
then,
based on TSMC’s
requirements,
to revamp
the
existing
process and equipments. The revamping work includes: civil work, steel
structure, equipments, piping, control system, electric power, thermal
insulation, fire
fighting works.
5. Major construction item:
◆
GF-337/338/340
sewer sumps
system
existing deodorizers
removed and piping modified.
◆
GF-337/338/340 new
added
individual Flame arresters,
pressure controls,
explosion proof
inverter fans,
PT, PF, check valves
and monitoring system.
◆
Each individual 3 sets of
sewer sumps
VOC
recovery
system and new VOC piping to water
seal tank
with
flame arrester and PDG
installed
in common
VOC trunk pipe line
◆
The common VOC trunk pipe line having sufficient
capacity
&
tie-in connection size
for later
expansion
of
5 reserved
oil tanks'
VOC
recovery.
◆
Overall VOC recovered
piping, civil works, steel structures, support, instruments and
controls,
electric power,
control box and panel, wiring, cables,
sandblasting and painting works,
and to
cooperate
with
the Client
for
whole
system
testing and commissioning.
|