1.
Proj. Name:Storage
Tanks VOC Recovery EPC Project
2.
Client:Taiwan
SM Corporation (TSMC)
3.
Proj. Period:June
2020∼Mar.
2021
4. Proj. Description:
This project
is to
provide the new VOC recovery system for TSMC Kaohsiung plant existing
MT-306A/B Benzene storage tanks, which includes Engineering design,
Procurement and Construction (EPC) scopes. Based on data and requirements
given by the Client, Mascol shall proceed assessment and basic design to
recover the VOC from MT-306A Tank to new built water seal drum; finally it
will be delivered to existing Boiler for burning off to comply with the VOC
emission regulations issued by local EPA. This project shall fullfully
understand the characteristic of various tanks’ products and related basic
designed data; then, according to TSMS’s requirement and specifications, to
proceed all necessary revamping for the existing process and facilities. The
revamping works include: civil works, steel structures, new equipments,
pipings, control system, electric power, thermal insulation, fire fighting
works.
5. Major construction item:
◆
The new MT-306A storage tank VOC recovery piping system started from the
existing
Flame Arrester and connected to the new Buffer Tank Inlet Nozzle Flange.
This segment of
VOC piping shall have a tie-in nozzle with shut off valve and blind flange
for MT-306B
storage
tank VOC piping connection in the future.
◆
The new MT-306A VOC recovery piping system shall have its own Flame
Arrester/
pressure control/explosion proof inverter ID Fan/PT/PG/check valve and
monitoring system.
◆
Buffer Tank x 1 and Water Seal Drum x 1.
◆
The new built Water Seal Drum down stream the new Buffer Tank shall have
additional
sufficient volume capacity to handle the total VOC flow rate recovered from
another seven
tanks in the future, and the recovered common VOC trunk pipe line size down
stream the
Water Seal Drum shall also consider the total VOC flow rate with sufficient
capacity to be
delivered to the existing Boiler Fans inlet common Header for burning off.
◆
Overall VOC recovered pipings, civil works, steel structures, supports,
instruments and
controls, electric power, control box and panel, wiring, cables,
sandblasting and painting
works, and to cooperate with the Client for whole system testing and
commissioning.
|