1.
Proj. Name:CPCT
No.1 Reformer Sour Water Stripping System Replacement
Turn-Key Project
2.
Client:CPC
Tao-yuan Refinery
3.
Proj. Period:Nov.
2023∼Oct.
2025
4. Proj. Description:
This project
is
designed to strip the Sour Water collected from Refining Dept. I&II, and it
can handle 30T/h Capacity. After
stripping, the recovered gases are sent to Sulfur Recovery Units and
stripped water from stripper bottom pumped to Topping
#1/#2
Desalters for reuse in order to significantly reduce Industrial Water usage.
If compared with the existing SWS System of No.1 Reformer / Zone 625
area, the NH3 concentration in stripped water can be decreased
with 35.5%, and ITB required specifications of
H2S≦5ppmw
& NH3≦20ppmw
can be complied.
5. Major construction item:
◆
Sour Water Stripper x 1 Unit, incl. 1,700mm ID x 45 Trays w/spacing 600mm
and
internals (mat’l:S.S.
321). The top head and top part of
shell of trays #1 to
#20 shall
be
cladded plate of A-263 (Base metal of A-285 w/3mm 410 S.S. Cr steel cladded
plate).
◆
Feed/Effluent Exchangers A/B x 1 Unit,
Reboiler x 1 Unit, Trim Cooler x 1 Unit (Tubes
mat’l:316L
S.S.).
◆
Overhead Air Cooled Condenser A/B x 1 Unit (mat’l:Alloy
825), w/VFD Explosion-
proof T3 Motors.
◆
Surge Drum w/inclined paralled plates of Coalescer (mat’l:316L
S.S.) x 1 Unit.
◆
Overhead Reflux Drum x 1 Unit & Steam Condensate Pot x 1 Unit.
◆
API A8 S.S. Centrifugal Pumps x 7 sets w/Double Mech. Seals as per API 682
(incl. Explosion-proof
T3 Motors).
◆
6” Static Mixer (mat’l:316L
S.S.) x 1 set & H.P. Steam Desuperheater x 1 set
(incl. Pressure Reducing Valve).
◆
For Vessels / Drums / Heat Exchangers in NACE Sour Service, the requirement
specified in NACE Std. MR0103 shall be followed.
And full killed carbon steel (C.A.
6mm
for AB6S or BB6S) shall be used for NACE Sour Service.
◆
On-line Analyzers (NH3-N) x 2 Sets, Field Sampling System x 4 Sets, H2S Gas
Detector x 9 Sets, Digital Colour CCTV x 4 Sets.
◆
Geological Drilling Investigation, Civil Foundation, steel structure
w/Fire-Proofing,
Operation Platforms, Piping Supports, relative Applications for Government
Permits &
Construction Licenses.
◆
All required PV/FV/LV/TV Control Valves & PSV Valves, all FE/FT/PT/TE/TT/LT
instruments (Gauges) for Flow, Pressure, Temperature, Level Controls.
◆
Power Equipment incl. MCC Panels, Site Explosion-proof Lighting Fixtures,
Grounding,
Communication, Power Cables & Conduits.
|