1.
Proj. Name:MAn、BDO、H2
and OSBL foundation civil work
2.
Client:TCC
Chemical Corp.
3.
Proj. Period:2009.07∼2009.12
4. Proj. Description:
This project consists of civil work for the
relocation of original MAn、BDO、H2 and OSBL facilities from Zhang Bing
industrial park to Taiwan Prosperity Chemical LinYuan site. Also, the
construction includes building new fire-hydrant water pump room, compressor
room, storage tank room, and other infrastructures. The project requires
input of PC piles, facility equipments, steel structure, water dikes,
process water drains, RC surface coating, and a new 6 meter roadway.
5. Major construction item:
item |
Content |
MAn-2 |
BDO |
H2 |
OSBL |
1 |
PC piles |
267 |
332 |
44 |
111 |
total |
754 piles |
2 |
Facility foundations |
51 |
85 |
8 |
46 |
total |
190 sets |
3 |
Steel structures |
20 |
36 |
32 |
189 |
total |
277 sets |
|