1. Proj. NameTa-lin Refinery 3/4 gasoline blending system instruments and

installations

2. ClientCPC Ta-lin Refinery

3. Proj. PeriodNov. 2010∼Mar. 2012

4. Proj. Description

This project is to install and test of instruments. The contents includes: wiring connection from local instruments to DCS marshalling box, installation of air piping, loop testing, leak test, correction of instruments.

5. Major construction item:

Main Instruments

Amount (sets)

AUTOMATIC RECIRCULATION CONTROL VALVE

36

MASS FLOW METERS

6

DIFFERENTIAL PRESSURE INSTRUMENT (SMART TYPE)

2

CONTROL VALVES

30

MOTOR OPERATED VALVES

32

PRESSURE GAUGE

49

PRESSURE INSTRUMENT

4

PRESSURE SWITCHES

30

PRESSURE SAFETY (RELIEF) VALVES

7

TEMPERATURE  INSTRUMENT

2

STATIC MIXER

2

TURBINE FLOW METER

22