MCC and the electrical room power panels are arranged and installation completely 2500KVA, 300KVA Non-crystallized Transformer and 300KW Diesel Generator

1. Proj. NameCPC Ta-lin Refinery Area G Electrical Equipments and Power

Distribution Project

2. ClientCPC Ta-lin Refinery

3. Proj. PeriodAug. 2010∼Mar. 2012

4. Proj. Description

This project is providing CPC Ta-lin Refinery Area G (Spherical Tanks Farm Area) for the designed electrical equipments and power distribution system. Which consisting of electrical material & equipment supply, installation, construction, inspection, testing and commissioning for power distribution, lighting, grounding, intercom and public address.

5. Major construction item:

Main equip.

Specification

Quantity

High Voltage Power Panels & TPC’s MOF

12 / 24KV

3 units

Low Voltage Power Panels and Capacitor Panels

460V

3 units

Motor Control Center

460V

22 units

Non-crystallized Transformer

2500KVA, 300KVA

2 units

Lighting Panel

220V

8 units

Diesel Generator and Automatically Switch Panel

300KW 

1 unit

UPS and DC Systems

20KVA, 30A

2 units

Intercom and Public Address System

5 Channels w/ Explosion Proof

Whole Plant

Explosion Proof LED Streetlamp

100W

80 units

LED Streetlamp, Light pole 8M Height

100W

66 units

Underground PVC Conduit Bank Embedment (Including 15 R.C. Manholes)

 

655 meters