1.
Proj. Name:Ta-lin
Refinery B404 boiler environmental and combustioning Facility
Revamping
Turnkey Project
2.
Client:CPC
Ta-lin Refinery
3.
Proj. Period:Nov.
2011∼Feb. 2013
4. Proj. Description:
This project is to reduce B404 Boiler (MCR 150
Ton/hr) NOx emission to 40ppmv by installing new SCR, APH, SAH,
inter-connecting ductworks. This also includes civil work, steel structure,
electrical, instrument and piping……, etc.
5. Major construction item:
◆
New SCR & AIG system
◆
Dismantle old horizontal APH and SAH and replace with new APH (add a new
vertical
type air pre-heater) and SAH.
◆
Civil foundation, steel structure/welding, operation platform, hazardous
license
registration.
◆
Renew ductworks with SUS304 duct expansion joint and insulation.
◆
Electrical engineering includes MCC panels and grounding network and Ani-Explosion
lighting fixture.
◆
Instrument
renewal including NOx detector, analyzer and transmitters.
◆
Piping renewal including new ammonia injection system (AIG) & installation.
|