1.
Proj. Name:De-NOx
Turnkey Project for No.10 Topping Unit of CPC Ta-Lin
Refinery
2.
Client:Project
& Construction Div. of CPC Corp., Taiwan
3.
Proj. Period:Sep.
2015∼Nov. 2016
4. Proj. Description:
This project is to comply with domestic NOx
emission regulation by installing new SCR with Ammonia Injection Grid (AIG),
replacing flue gas Inducing Draft Fan (ID Fan), adding ammonia dilution air
fans, revamping inter-connecting air and flue gas ducts associated with
civils and steel structures, instrumentation, electrical works…… etc., with
related to Furnace (F-1001) for No. 10 Topping Unit of Ta-Lin Refinery. When
the project is accomplished the flue gas emission of NOx concentration at
SCR Exit will be reduced as low as to 30ppm;meanwhile, the escaped ammonia
concentration shall not exceed 10ppm measuring at the exit of SCR.
5. Major construction item:
◆
SCR De-NOx equipment and Ammonia Injection Grid
System (AIG).
◆
Flue gas Inducing Draft Fan x 1 set (Incl.
frequency converter motor).
◆
Ammonia dilution air fan x 2 sets.
◆
Ammonia station with ammonia bottle (@500kg x 3
sets) and fire sprinkler system.
◆
Civil foundation and new paving, piling, steel
structures, operation platforms, acquisition of
government permits and construction license application.
◆
Modification and renew the air/flue gas
ductworks, mount duct guide vanes, maintenance
manholes, SS 304 duct expansion joint and insulation.
◆
Piping system for SCR/AIG, utility station, fire
protection, emergency shower and eye
washer with its piping.
◆ Provide instruments,
control valves and online analyzers (NOx / NH3 / O2).
◆
PLC Control System, SS 304 PLC cabinet, 2000
points minimum capacity of Graphic
Configuration, DC Power, CPU, and fully redundant communication module
hardware.
◆
Electrical system including power, grounding,
control, signaling, lighting for the design,
procurement, construction and acquire electrician certificate Newly mount 2
sets of power
distribution panel and 1 set of frequency converter panel.
|