

Emergency water pump testing |
Emergency water pump diagram |
1.
Proj. Name:Water
Distribution
Collecting
Main
Emergency
Water
Collecting
System
2.
Client:Taipei
Water department
3.
Proj. Period:Sep.
2006~Nov. 2007
4. Proj. Description:
The purpose is to acquire emergency water source from underground pipe when
natural disaster occur and is unable to provide water normally.
5. Major construction item:
◆
8 units of
∮ 220V
2hp inundation electric water pump, lifting:30M, water flow:
150CMD
◆
8 units of small motor generator
∮ 110/220V
(60HZ),output:
6.5kVA, max :7.6KVA
◆
8 sets of 8 inch hand carry portable drawing fan∮
220V 150W
◆
8
sets of gas detector
◆
Produce 24
sets of stainless steel water pipe
|