


1.
Proj. Name:Tai-Nan
Dong He Water Pipe Bridge River Crossing Project
2.
Client:Taiwan
Water corporation South District
3.
Proj. Period:Oct.
2011~Mar. 2012
4. Proj. Description:
This project is to construct a new π-type pipe
rack across YanShui River and connect the water piping on both sides.
5. Major construction item:
◆
π-type pipe rack support:material
type A709 Gr50,bridge
span 43.61m. Total weight
approximate 50T.
◆
Bridge base includes: Ø100cm,L=21M
foundation piles X 8 sets on-site construction.
◆
Retaining wall and road construction: 110M.
◆
Water piping: Ø80cm SP steel water pipe wielding
and installation 139M.
|