1. Proj. NamePiping Works for No.2 HDS Plant

2. ClientChinese Petroleum Corp. / Taoyuan Refinery

3. Proj. PeriodSep. 1994 ∼ Aug. 1995

4. Proj. Description

This project included all above-ground piping works for CPCT No.2 HDS Plant, whose all pipes, fittings & valves were provided by CPCT and done by Mascol. The scopes included pipe sand blast & painting, welding, annealing, pressure test (hydro / pneumatic), also together with fabrication & installation of all pipe supports. The pipe had high hydro-test pressure, up to 105kg/cm2G for the high pressure system.

5. Major construction item:( all Dia. of pipes converted into 6”φ-Sch.40 standard pipe units)

  6”φC.S. pipe sand blast & painting:24,540 m

  6”φ-Sch40 C.S. pipe welding & installation:23,320 pls

  6”φ-Sch40 alloy pipe welding & installation:2,100 pls

  6”φ-Sch40 S.S. pipe welding & installation:630 pls

  6”φ pipe annealing after welding:4,700 pls

  6”-150# flange installation (1 set with 2 pcs):2,700 sets

  Water consumed for pipe flushing & hydro-test (incl. pneumatic test):980 tons

  Steam tracing tubes:4,100 m