1.
Proj. Name:Piping Works for No.2 HDS Plant
2.
Client:Chinese
Petroleum Corp. / Taoyuan Refinery
3.
Proj. Period:Sep.
1994 ∼ Aug. 1995
4. Proj. Description:
This project included all above-ground piping works for CPCT No.2 HDS Plant, whose all pipes, fittings & valves were provided by CPCT and done by Mascol. The scopes included pipe sand blast & painting, welding, annealing, pressure test (hydro / pneumatic), also together with fabrication & installation of all pipe supports. The pipe had high hydro-test pressure, up to 105kg/cm2G for the high pressure system.
5. Major construction item:( all Dia. of pipes converted into 6”φ-Sch.40 standard pipe units)
◆
6”φC.S. pipe sand blast & painting:24,540 m
◆
6”φ-Sch40 C.S. pipe welding & installation:23,320 pls
◆
6”φ-Sch40 alloy pipe welding & installation:2,100 pls
◆
6”φ-Sch40 S.S. pipe welding & installation:630 pls
◆
6”φ pipe annealing after welding:4,700 pls
◆
6”-150# flange installation (1 set with 2 pcs):2,700 sets
◆
Water consumed for pipe flushing & hydro-test (incl. pneumatic test):980 tons
◆
Steam tracing tubes:4,100 m
|