Cooling Tower and Piping Cooling Water Lines of No.3 Co-Generation Plant

1. Proj. NameCooling Water Pipings of #6 Cooling Tower

2. ClientChinese Petroleum Corp. / Taoyuan Refinery

3. Proj. PeriodJune 1997Nov. 1997

4. Proj. Description

This project provides 32 SW/RW cooling water main pipe lines to supply cooling water from #6 cooling tower system for the use of CPCT No.3 Co-Generation plant.  In addition to 32 main pipe lines, it also includes 24 1410and 8branch pipe lines, which goes above and under ground.

5. Major construction item:(all Dia. of pipes converted into 6”-sch.40 standard pipe size

to count)

  6-sch40 C.S. pipe welding & installation2,500 pls

  6-150# flange installation (1 set w/2 pcs)300 sets

  6 steel pipe shoes fabrication & installation900 sets