Cooling Tower and Piping Cooling Water Lines of No.3 Co-Generation Plant

1. Proj. Name:Cooling Water Pipings of #6 Cooling Tower

2. Client:Chinese Petroleum Corp. / Taoyuan Refinery

3. Proj. Period:June 1997∼Nov. 1997

4. Proj. Description:

This project provides 32”∮ SW/RW cooling water main pipe lines to supply cooling water from #6 cooling tower system for the use of CPCT No.3 Co-Generation plant.  In addition to 32”∮ main pipe lines, it also includes 24”∮、 14”∮、10”∮and 8”∮branch pipe lines, which goes above and under ground.

5. Major construction item:(all Dia. of pipes converted into 6”-sch.40 standard pipe size

to count)

◆  6”∮-sch40 C.S. pipe welding & installation:2,500 pls

◆  6”∮-150# flange installation (1 set w/2 pcs):300 sets

◆  6”∮ steel pipe shoes fabrication & installation:900 sets