1.
Proj. Name:Inlet & Outlet Piping Works for RFCC Expander GE7201
2.
Client:Chinese
Petroleum Corp. / Taoyuan Refinery
3.
Proj. Period:Nov.
2005 ∼ Jan. 2006
4. Proj. Description:
Cut, Re-installation, Alignment & Welding work for large size pipe lines & large bore flanges, including 98”φ x 16tmm S.S. 304H Inlet/Outlet pipe lines of Expander & 52”φsch. XS C.S. pipe line, and different sizes of flanges with Dia. of 64”φ, 70.5”φ, 72”φ & 98”φ.? To tie-in with existing Expander, all works are performed in high altitude with a scaffold.? The accuracy of alignment is required within 5 micron.
5. Major construction item:
◆
Mobile generator
◆
Welding machine
◆
Tig Welding machine
◆
300T Crane
◆
500T Crane
|