Header image

 Mascol Engineering Co.,LTD

 Leading Technology in Integration Engineering

line decor   HOME     BACK  


     ENGLISH     中文


 
 

 


 

84 meters meteorology tower before dismantle Rotunda observation deck after retrofit

1. Proj. NameRetrofit Work for 84 meters meteorology tower for CPC

Environmental Division

2. ClientChinese Petroleum Corp. / Tao-yuan Refinery

3. Proj. PeriodAug. 2006Oct. 2006

4. Proj. Description

The scope of work included sand blasting and painting work for 84 meters high meteorology tower.

5. Major construction item:

  Triangle bracing repair

  Add rotunda observation deck

  Sand blasting and painting

  Erection of 84 meters high meteorology steel structure