Header image

 Mascol Engineering Co.,LTD

 Leading Technology in Integration Engineering

line decor   HOME     BACK  


     ENGLISH     中文


 
 

 


 

84 meters meteorology tower before dismantle Rotunda observation deck after retrofit

1. Proj. Name:Retrofit Work for 84 meters meteorology tower for CPC

Environmental Division

2. Client:Chinese Petroleum Corp. / Tao-yuan Refinery

3. Proj. Period:Aug. 2006∼Oct. 2006

4. Proj. Description:

The scope of work included sand blasting and painting work for 84 meters high meteorology tower.

5. Major construction item:

◆  Triangle bracing repair

◆  Add rotunda observation deck

◆  Sand blasting and painting

◆  Erection of 84 meters high meteorology steel structure