Header image

 Mascol Engineering Co.,LTD

 Leading Technology in Integration Engineering

line decor   HOME     BACK  


     ENGLISH     中文


 
 

 


 

36" pipe installing and welding 36" pipe hoisting

1. Proj. NameP1019 distiller pipeline maintenance

2. ClientCPC Taoyuan Refinery

3. Proj. PeriodDec. 2006~Jan. 2007

4. Proj. Description

Tower tank pipeline upgrade and maintenance

5. Major construction item:

  High rise hoisting

  36" pipeline elevated welding

  Pipeline pressure testing