1.
Proj. Name:Hydrogen
Purification Unit Relocation Project
2.
Client:CPC
Tao-yuan Refinery
3.
Proj. Period:Nov
2008~June. 2009
4. Proj. Description:
This Project is to relocate the original
Hydrogen purification units from Kao-hsiung Refinery to Tao-yuan. The
project consists of civil engineering, factory design and construction,
building license registration and the pipe connection with oil product,
material logistics, pipeline design and construction, HPU relocation and
installation, control system design and installation, compressor motor
upgrade from 3.3KV to 4.16KV, catalyst re-fill, commissioning, hydro testing
and acquire certificate issued by Taiwan Pressure Vessel Association.
5. Major construction item:
Main equip. |
Equip. Name |
D-101 |
Knockout Drum |
D-102 |
Buffer Tank |
A110~A160 |
Absorber Tank x 6 |
C-101 |
600KW Compressor x 1 with
Motor |
D-103 |
Knockout Drum |
E-101 |
Compressor after Cooler |
|