PSA Absorbers Area & H2 Compressor Relocation Completion Photo (1) PSA Absorbers Area & H2 Compressor Relocation Completion Photo (2)

1. Proj. NameHydrogen Purification Unit Relocation Project

2. ClientCPC Tao-yuan Refinery

3. Proj. PeriodNov 2008~June. 2009

4. Proj. Description

This Project is to relocate the original Hydrogen purification units from Kao-hsiung Refinery to Tao-yuan. The project consists of civil engineering, factory design and construction, building license registration and the pipe connection with oil product, material logistics, pipeline design and construction, HPU relocation and installation, control system design and installation, compressor motor upgrade from 3.3KV to 4.16KV, catalyst re-fill, commissioning, hydro testing and acquire certificate issued by  Taiwan Pressure Vessel Association.

5. Major construction item:

Main equip.

 Equip. Name

D-101

Knockout Drum

D-102

Buffer Tank

A110~A160

Absorber Tank x 6

C-101

600KW Compressor x 1 with Motor

D-103

Knockout Drum

E-101

Compressor after Cooler