1.
Proj. Name:CPCT
#3 Boiler Flue Gas Environmental Revamping Turnkey Project
2.
Client:CPC
Tao-yuan Refinery
3.
Proj. Period:Nov
2012~Jan. 2014
4. Proj. Description:
The goal of this turkey project is to reduce
CPCT #3 Boiler (MCR 225 Ton/hr) NOx emission to less than 100/25 vppm at SCR
inlet/outlet, with ammonia slippage less than 5vppm, by the means of
installing new SCR, renew the facilities including APH, FD Fan, SAH, LNB,
ECO, Deaerator, DCS, PLC, etc.
5. Major construction item:
◆
Add Selected Catalyst Reactor (SCR) & Ammonia
Injection Grid (AIG) system.
◆
Renew Air Pre-heater (APH).
◆
Renew Forced Draft Fan (FDF) and Hydraulic
Coupling.
◆
Renew Steam Air Heater (SAH).
◆
Renew Low NOx Burners, Igniter and Flame
Detector.
◆
Renew Economizer of #3 Boiler.
◆
Renew/Revamp Deaerator.
◆
Revamp/Repair Boiler Rear-Wall.
◆
Renew Air/Flue Gas Ductwork.
◆
Updating/Expanding DCS control system,
software/hardware in compliance with existing
PLC and
instrumentation work.
◆
Others: Renew existing CCTV, PA system. Updating
ARCV to FCV by DCS control for
the existing 3 sets of boiler feed water
pump P-302A/B/C.
◆
With associated works as mentioned above equipments
for civil foundation, steel
structural, platform & stair, piping,
electrical, instrumentation, and insulation.
|