1.
Proj. Name:CPCT
Flare Gas Recovery System (FGRS) Turnkey Project
2.
Client:CPC
Tao-yuan Refinery
3.
Proj. Period:June
2014~Oct. 2015
4. Proj. Description:
The goal of this turnkey project is to recover
all the flare gas of CPCT with the recovery capacity of 6,400Nm3/hr
in order to comply with local stringent environmental regulation. By means
of installing two trains of the combined Flare Gas Recovery/Gas Sweetening
System (FGRS) through comprise, separation, neutralization and the sweetened
gas (containing less than 80 ppm of H2S) is to be sent back to
fuel system for refinery process use.
5. Major construction item:
◆
Liquid Jet Ejectors:
Material 316L SS, 4x1,600 Nm3/hr @discharge pressure 6 kg/cm2G.
◆
5 sets of various pressure vessel, 4 sets of heat
exchanger, 1 set of Amine absorber and
3 sets of tank.
◆
4 sets of multi-stage
centrifugal pump: API 610 A-8, flow rate 292 m3/hr @discharge
pressure 51 kg/cm2G.
◆
8 sets of general centrifugal pump and 4 sets of diaphragm pump.
◆
4 sets of motive fluid
filter: 313 m3/hr w/40 mesh, 2 sets of rich Amine filter: 20.4 m3/hr
w/
filtration req’d : 95% of particles ≧ 10μm.
◆
Civil work, handling of underground objects,
equipment foundation, piling, steel structure
and fireproof cladding.
◆
Piping fabrication and erection for
ISBL/OSBL/Utility/Fire fighting is about 55,000 DB
approximately, the work is also including material supplies, pipe supports,
hot tapping tie-in,
PWHT in site, acid wash and insulation, etc.
◆
Electricity and electrical equipments, lighting, grounding, PA system, cable
& conduit with
cable pulling and testing.
◆
Instrumentation and control system equipments, which shall
include control system,
vibration and temperature monitoring system for
rotating equipment, instruments, gaseous
detectors, control valves, POV,
safety valves, CCTV, fittings, cable & conduit, etc.
|