1.
Proj. Name:SRU
Tail Gas Emission Revamping Facilities Turnkey Project
2.
Client:Tao-yuan
Refinery of CPC Corp., Taiwan
3.
Proj. Period:Oct.
2015~Nov. 2016
4. Proj. Description:
This project is to comply with environmental
regulation requirements of air pollution control and focus on abnormal
operation during startup/shutdown and de-sulfur process of SRU #2 & #3 of
Refinery Section II, Tao-yuan Refinery. After installing a tail gas
treatment facilities, which will be able to reduce SO2 emission
concentration and minimize odor smell in air, it can be expected to create a
better environmental air quality. By those revamping facilities, the high
concentration of 1% SO2 content in tail gas will be scrubbed by
caustic soda solution and the emission of SO2 concentration shall be
decreased to ≦50ppmv, and also the Chemical Oxygen Demand (COD) of Waste
Water effluent from the facilities shall be limited less than 1,000vppm.
5. Major construction item:
◆
Reverse Jet Scrubber x 1 Unit (Incl. 316L
Absorption Vessel, AL6XN Upper Inlet Barrel,
316L Lower Inlet Barre, 8” SiC Reverse jet Nozzles, Froth Column、Chevron
Demister,
Sparging System of Oxidation Air).
◆
Scrubber Circulation Pump(Alloy 20) x 2 sets,
Liquid Caustic Pump (316L) x 2 sets
◆
FRP Liquid NaOH Tank x 1 set.
◆
Flue Gas Shutoff Valve w/Steam Jacket x 4 sets
(ANSI Class V / IP65).
◆
Effluent Filter and Piping System w/different
kinds of Material.
◆
Civil Foundation, Steel Structure, Operation
Platform, Dike and Acquisition of Government
Permits and Construction License Aapplication.
◆
Dismantle/Re-install Existing Culvert, Reconstruct of Collecting Sump/Retain
Wall, and
Recover the Existing Side Slope/ Paving / Ditch.
◆
Instruments Incl. Control Valves, Radar Wave Liquit L/T, Magnetic Flow
Meter, D/P
Density Transmitter, PH Analyzer, and Thermometer/ Pressure Gauge,
etc.
◆
Power Equipment Incl. MCC Panel, Site
Explosion-proof Lighting Fixture, Grounding,
Communication, Power Cable and Conduit, Site Switching Station.
|