1. Proj. NameOil Mud Incinerator Off Gas Emission Improvement Project

2. ClientCPC Tao-yuan Refinery

3. Proj. PeriodMay 2018Oct.. 2019

4. Proj. Description

The purpose of this Project is for the improvement of off gas emission from existing CPCT rotary kiln to meet local EPA requirement due to higher sulphur content in oil mud fed, which is over the original design condition and could result in a higher SOx emission happened.  After the new scrubbing system of facilities installed, the off gas SO2 emission can be extremely reduced and also the odor smell can be improved obviously; therefore, a much better environmental air quality can be gained.  It is expected that in the off gas inlet conditions with 0.2 Vol% high SO2 concentration at gas flow rate of 12,000 Nm3/hr (max.) the off gas would be scrubbed by NaOH caustic soda solution, and the SO2 concentration of emission outlet could be decreased to   50ppmv with COD of effluent 900 mg/L.

5. Major construction item:

  Reverse Jet Scrubber x 1 Unit (Incl. 316L Absorption Vessel, Duplex 2205 Inlet Barrel,

8” SiC Reverse jet Nozzles, Froth ZoneChevron Demister……etc.).

  Scrubber Circulation Pump x 2 sets, Liquid Caustic Pump x 2 sets, Effluent Pump x 2 sets,

Oxidation Blower x 2 sets.

  Counter Flow Cooling Tower x 1 set.

  FRP Liquid NaOH Tank x 1 set.

  316L Oxidation Liquid Tank (Incl. internal air spargers) x 1 set.

  Renew Existing I.D. Fan (Incl. Inverter Motor) x 1 set, Replace Some of Biger Diameter

Inlet/Outlet Flue Gas Piping of I.D. Fan .

  Process & Utility Piping System w/different kinds of Material, Effluent Wastewater Piping.

  Civil Foundation, Operation Platform, Dike and Acquisition of Government Permits and

Construction License Aapplication.

  Instruments Incl. Control Valves, Ultrasonic Liquid L/T, D/P Flowmeter, D/P Density

Transmitter, PH Analyzer, and Thermometer/ Pressure Gauge, etc.

  Power Equipment Incl. MCC Panel, Site Explosion-proof Lighting Fixture, Grounding,

Communication, Power Cable and Conduit, Site Switching Station.