1. Proj. Name:The LNG Phase III Stations Construction Project in Hsinchu and

Miauli Area

2. Client:Chinese Petroleum Corp. / LNG Proj. & Construction Div.

3. Proj. Period:Apr. 1999 ∼ June 2003

4. Proj. Description:

Total of eight stations are built in different locations, including Governor Station x (3), Block Station x (3) and Switch Station x (2). The work scopes included civil & architecture, piping, air condition & ventilation, electrical works, detail design of vent stack, and permit license application. In addition to those material & equipment provided by Mascol in turnkey basis, there are many pipe fittings & valve sets valued NT$68,000,000 (≒USD2,100,000) provided by CPC to be transported& installed & started up by Mascol.

5. Major construction item:

In addition to piping works, the constructed items include civil & building (w/license application)、diesel generator set、FM-200 automatic fire fighting system、axial type N.G. check valve、fire water pump、high pressure vent stack、vent stack silencer..., etc. Construction pricing for N.G. trunk line with pipe size between 18”φ∼36”φis more than NT$20,000,000 (USD620,000) without VAT.