Header image

 Mascol Engineering Co.,LTD

 Leading Technology in Integration Engineering

line decor   HOME     BACK  


     ENGLISH     中文


 
 

 


 

   

1. Proj. NamePiping / Civil Construction & Rotary Machine Installation in Changhwa

& Shining Booster Station

2. ClientChinese Petroleum Corp. / LNG Proj. & Construction Div.

3. Proj. PeriodApr. 1999 ∼ Nov. 2004

4. Proj. Description

This project includes Changhwa Booster Station new construction and Shining Booster Station expansion, which included scopes of civil/building, piping, ventilation, equipment supply & installation, detailed design of vent stack with silencers & noise prevention wall, and permit license application works.In addition to the scopes mentioned above, Mascol is also in charge of the installation of high capacity N.G. compressors and their accessories (3 units in Changhwa & 1 unit in Shining) provided by CPC, which portion totally is worth NT$680,000,000 (≒USD21,000,000) including compressors, accessory equipments, valve sets ..., etc.

5. Major construction item:

  Air compressor set (600Nm3/hr) x 2

  Sump pump x 3

  Air dryer set (522Nm3/hr) x 1

  Cooling tower (w/pump) x 2 (w/3)

  Fire water pump set x 2

  Fuel gas filter x 5

  5T Overhang crane (explosion proof) x 1