Leading Technology in Integration Engineering |
||||||||||||||
![]() |
|||||||||||||||
|
1. Proj. Name:2016 water pumping station and water gate upgrade project 2. Client:Yilan county government 3. Proj. Period:SEP. 2016∼APR. 2017 4. Proj. Description: 2 main sections
5. Major construction item:
◎
Old port Tidal wave prevention gate
(12T)
X 2 sets
with 20kw electric power generator
◎ 25 connection gate
(28T)
X 4 sets
with 20kw electric power generator X
2 sets ◎ Section 35/45 6 connection water gate (3T) X 12 sets with 20kw electric power
generator X 2
sets
|
||||||||||||||