Proj. Name:Phase
I Rotary Trash Rack Replacement (Incl. Installation,
Commissioning &
Training, etc.)
2.
Client:CPC
Corporation, Taiwan / Natural Gas Division Yung-An LNG Plant
3.
Proj. Period:Jan.
2018∼May
2019
4. Proj. Description:
The rotary trash rack is central inflow type with single inlet and double
outlet. It’s installed in a wet and salty area and mainly for filtering
seawater debris. The unit is automatically start and shut down by preset
timer controls. In order to remove suspended material and by the rotary
screen to picked up the dirt in the seawater. The dirt is removed by the
spray system when the screen basket is traveled to the top. Then the dirt is
fall into the discharge trench and flow to the discharge channel. Each trash
rack is equipped with a FRP splash guard mounted on the floor. To cover the
rotating parts and spray system mounted above ground. The shroud shall be
watertight and fitted with two quick-opening inspection covers (including
leak-proof gaskets). In order to view the chain and screen basket. Provision
of another transparent view hole is required. There is flushing device
installed in dirt bucket to speed up the dirt removal. The trash rack also
features a fast / slow double speed design. The unit is drive by the
electric motor with direct gear reducer. Which is design under the
circumstance that grid is full of dirt it still can be started.
5. Major construction item:
◆
Two (2) units of rotary
trash rack.
◆
Local control panel w/instrument control
equipment.
◆
Front stop damper.
◆
Rear stop damper.
◆
Water sprays cleaning system..
◆
Channel cleaning, sludge removal.
◆
Training & commissioning.
|